Under Construction logoLandscaping work will begin on the south side of the Calice Center (in the area between Calice and the Natural Science Center).  Please be aware of all construction signing, barricades and directives in this area. The pedestrian walkway directly behind Calice will be closed during this work, which will last approximately two weeks.

Additional asbestos removal work (floor tile removal) will take place in Calice over the next two weeks.

Construction of the east curtain wall (exterior wall) in the Connector will continue.

Replacement of the lower roof on the Calice Center will begin this week.

First floor finishing work in Calice continues (floor prep, taping, finishing, painting).

As always, if anyone has any questions, please contact David Ligeikis at (607) 765-9710.