- The south wall in the West Gym is being repaired prior to the installation of wood-backed wall padding (black with a gold stripe to match the rest of the gym).
- The showers in the second floor women’s locker room in the Student Center are currently under repair.
- The concrete “thermal” floor was poured today in the Connector between the Calice Center and the Business Building.
- Permanent high voltage power lines are being “pulled” in the Calice Center.
- Tile work continues in the first floor restrooms.
- Roof insulation and a vapor barrier are being installed in the Connector area.
- Prep work has begun for floor leveling, most of which (approximately 500 square feet) will take place in the southwest corner of Calice.
- The elevator shaft (block) is nearing the ceiling in Calice (next step is to break through the ceiling).
NOTE: If you are interested in taking a tour of the building, please contact Pati Collins at ext 5007 or at collinspj@sunybroome.edu. Tours are given every Thursday at 11 a.m. Please meet at the project construction trailer. As always, if anyone has any questions, please contact David Ligeikis at (607) 765-9710.