- The new elevator foundation has been poured and work has begun on the new elevator shaft in the Calice Advanced Manufacturing Center.
- Tile work (both floors and walls) in the restrooms continues.
- Ductwork has been rerouted from the Business Building boiler room into the Connector/Atrium area.
- A chase wall has been constructed on the west end of the Connector/Atrium.
- Windows have been delivered and are on site with window installation set to begin this week.
- Light fixture installation and painting continues.
As always, if anyone has any questions, please do not hesitate to contact David Ligeikis at (607) 765-0710.