• The south entrance canopy foundation (for the new Calice Advanced Manufacturing Center) will be formed, inspected and concrete poured this week. A steel “topping off” ceremony will be held in the upcoming weeks to celebrate placement of the last piece of steel for this project.
  • Concrete will be poured this week for the floor of the second floor adjunct office as well as the floor for the connector between the Calice Center and the Business Building.
  • Solar panels will be delivered this week and layout will begin on the upper roof of Calice.
  • Waterproofing and sealing of the edges of the elevator shaft will take place this week.
  • Work continues on the heat pumps in the boiler room.
  • The Calice Center will be posted today to provide notification for upcoming further asbestos removal (tile floors)

As always, if anyone has any questions, please do not hesitate to contact David Ligeikis at (607) 765-9710.\

Under Construction logo